Before a data centre’s power supply was built, the design team needed proof that magnetic fields from high-voltage cables on a public bridge would stay within the public limits.

The challenge. A new data centre was to be supplied by high-voltage cables routed across a bridge open to the public. The engineering consultancy designing the route needed to show that magnetic fields on and around the bridge would be within the public exposure limits, before the design was finalised.

What we did. We modelled the magnetic fields from the cables in trefoil inside steel ducts, using the worst-case loading of one circuit at 568 A. We calculated fields at every accessible position on and near the bridge and compared them with the 100 µT public reference level. A follow-up study assessed whether shielding would be needed.

Calculated fields let a design be checked before anything is built.

The outcome. The assessment showed the 100 µT reference level would not be exceeded anywhere the public could reach, so no additional shielding was required. The design team had calculated, documented evidence of compliance, without a site survey and before anything was built. When later design changes were proposed, the same model could be re-run to check them.